Roberts Gorden MGB Series Manual de servicio Pagina 46

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 92
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 45
COMBAT
®
CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL
40 of 85
SECTION 10: COMMISSIONING
Gas/Oil Fired Heater
Installation Code and Annual Inspections:
All installation and service of ROBERTS GORDON
®
equipment must be performed by a contractor
qualified in the installation and service of equipment
sold and supplied by Roberts-Gordon Europe
Limited and conform to all requirements set forth in
the ROBERTS GORDON
®
manuals and all
applicable governmental authorities pertaining to the
installation, service, operation and labeling of the
equipment. To help facilitate optimum performance
and safety, Roberts-Gordon Europe Limited
recommends that a qualified contractor conduct, at
a minimum, annual inspections of your ROBERTS
GORDON
®
equipment and perform service where
necessary, using only replacement parts sold and
supplied by Roberts-Gordon Europe Limited.
Read this manual carefully before installation,
commissioning, operation, or service of this
equipment. All components are accessed via the
louvered access panel below the burner. Opening
the door exposes live electrical connections and hot
components.
10.1 Pre-Commission Checks
These instructions should be read in conjuction with
the burner manufactuers manual.
All pre-commission checks must be carried out
before firing the heater.
Ensure that the heater and all controls are suitable
for the fuel, pressure and electrical supply to which
they are to be connected.
Electrical Shock Hazard
Disconnect electric before service.
More than one disconnect switch may be
required to disconnect electric from
equipment.
Equipment must be properly grounded.
Severe Injury Hazard
Do not enter equipment while in operation.
Equipment may start automatically.
Do not operate with door open.
Installation, operation and service must be
done by a trained technician only.
DANGER
Failure to follow these instructions can result in death, electrical shock or injury.
Falling Hazard
Use proper safety
equipment and practices to
avoid falling.
Do not use any part of
equipment as support.
WARNING
Failure to follow these instructions can result in death, injury or property damage.
Burn Hazard
Allow equipment to cool
before service.
Internal components of
equipment may still be hot
after operation.
Explosion Hazard
Leak test all components of
equipment gas piping
before operation.
Gas can leak if piping is not
installed properly.
Do not high pressure test
gas piping with equipment
connected.
Vista de pagina 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 91 92

Comentarios a estos manuales

Sin comentarios