Roberts Gorden MGB Series Manual de servicio Pagina 26

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 92
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 25
COMBAT
®
CABINET HEATERS INSTALLATION, COMMISSIONING, OPERATION AND SERVICE MANUAL
20 of 85
Figure 11: Flue Installation (Models 15 - 100) Figure 12: Balanced Flue (Vertical)
NOTE: The balanced flue option is only available on
models 15, 30, 40 and 50.
6.3 Type C
12
, C
32
& C
62
Appliance
Room Sealed.
The heaters are designed to be installed as room
sealed appliances. The flue and air intake are run as
separate pipes to the special concentric wall or roof
terminal. See Page 20, Figure 12 through Page 21,
Figure 13. The wire mesh inside the fresh air
adapter on the heater must be removed prior to
installation.
If it is necessary to cut any section of flue, the
cut is made at the bottom of the lowest section
where it connects to the heater.
Description Part Number
Flue Adaptor 100 mm (4’) Cabinet 90501018K
Flue Adaptor 130 mm (6’) Cabinet 90501019K
Model Concentric Flue Diameter
15 (100 mm) 150 mm
30 - 50 (130 mm) 200 mm
Vista de pagina 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 91 92

Comentarios a estos manuales

Sin comentarios